Here is the current version of the files :
UI closed and Service stopped before copy.
Tasks IDs (right-clic on task name, "Copy task Id") :
Documents Françoise (disabled) : {3F625A21-F9B2-48EA-A03E-4B56D44F3E2D}
Documents Académie (disabled) : {AC166874-B69F-4493-98EB-113FDE579DD0}
Documents Françoise (enabled) : 9fbec96f-d605-4215-aa86-9f1fd998a337
Documents Académie (enabled) : ae55e8ac-7179-4dd2-817e-22b97cd640ae
Last thing : it is still good old CR 0.9.90 RC1 .
Scheduling not running as expected
Re: Scheduling not running as expected
Do you have a lot (A LOT) of documents in those directories?
--
Luis Cobian
Cobian Backup's creator
Luis Cobian
Cobian Backup's creator
Re: Scheduling not running as expected
Tested once again in a virtual machine simulating a sunday 1:00... Everything went OK.
Looking at the log file I see a lot of irregularities. For example:
2022-01-16 01:00:00 Ignoring the task Documents Françoise because it's disabled. ← ********** old task, same name
2022-01-16 01:00:00 Ignoring the task Documents Académie because it's disabled. ← ********** old task, same name
2022-01-16 00:59:12 A backup has started...
I don't see why the backup starts 1 minute before (but logged after) 1:00...
It's nothing I can reproduce here.
Looking at the log file I see a lot of irregularities. For example:
2022-01-16 01:00:00 Ignoring the task Documents Françoise because it's disabled. ← ********** old task, same name
2022-01-16 01:00:00 Ignoring the task Documents Académie because it's disabled. ← ********** old task, same name
2022-01-16 00:59:12 A backup has started...
I don't see why the backup starts 1 minute before (but logged after) 1:00...
It's nothing I can reproduce here.
--
Luis Cobian
Cobian Backup's creator
Luis Cobian
Cobian Backup's creator
Re: Scheduling not running as expected
Documents Françoise : 105.000 files
Documents Académie : 16.000 files
What surprises me the most is the fact that the two backups take place together twice a week but it is only on Sundays that the problem occurs.
Gabriel
Re: Scheduling not running as expected
There is nothing special about sundays what I can se.
--
Luis Cobian
Cobian Backup's creator
Luis Cobian
Cobian Backup's creator
Re: Scheduling not running as expected
I have a feeling that the problem lies in the big number of files that must be count and calculated. I wonder if the problem is also present if you disable the Engine-Calculate progress exactly. You won't see the progress in an exact way (or at all) but it could be interesting to see if the problem persists anyway. Could you disable this for the next sunday?
--
Luis Cobian
Cobian Backup's creator
Luis Cobian
Cobian Backup's creator
Re: Scheduling not running as expected
Hi Luis,
Upgraded to 0.9.94RC1 and disabled Engine-Calculate progress exactly.
Let's wait and see.
And I agree with you about Lewis Hamilton !
Upgraded to 0.9.94RC1 and disabled Engine-Calculate progress exactly.
Let's wait and see.
And I agree with you about Lewis Hamilton !
Gabriel
Re: Scheduling not running as expected
Still the same thing :
- first task is run twice (with no file backed up during the second run) and second is run only once
- but only on sunday and not on wednesday.
Gabriel
Re: Scheduling not running as expected
--
Luis Cobian
Cobian Backup's creator
Luis Cobian
Cobian Backup's creator